New Construction Projects In Dublin

Below, you will find a selection of projects our clients have commenced in Dublin this year.

Mixed-use Development

  • Value: €101m
  • Location: Clongriffin

  • Finish date: Jan 2028

  • Tier 1 Main Contractor

A mixed-use development comprising of two blocks providing a total of 408 apartment units with community arts and cultural floorspace.

Mixed-use Development

  • Value: €345m

  • Location: Donnybrook

  • Finish date: Nov 2026

  • Developer

A mixed-use scheme consisting of 690 apartments, a hotel, a childcare/crèche facility, restaurant and café.

Residential Development

  • Value: €160m

  • Location: Tallaght

  • Finish date: Jan 2030

  • Tier 1 Main Contractor

A residential development that comprises 635 residential units (125 social units, 387 affordable units and 123 private units.

Residential Development

  • Value: €51m

  • Location: Portmarnock

  • Finish date: July 2026 (Phase 1)

  • Developer

Phase 1 will consist of 195 units (26 duplex/apartments and 169 houses), ranging between 1.5 and 3 storeys in height.

Residential Development

  • Value: €91m

  • Location: South Circular Road

  • Finish date: Jan 2030

  • Main Contractor

416 residential units in 5 blocks with 404 apartments in 4 blocks ranging in height from 2 storeys to 16 storeys, over single level basement. 

Residential Development

  • Value: €30.6m

  • Location: Clonsilla

  • Finish date: Jan 2030

  • Developer

The construction of 181 apartments and duplex units, together with a childcare facility, in 8, three to six storey blocks.

Residential Development

  • Value: €69m

  • Location: Swords

  • Finish date: Jan 2030

  • Developer

274 residential units including 187 houses, and 87 duplex and apartment units, ranging from 2 – 5 storeys in height.

Mixed-use Development

  • Value: €32m

  • Location: Coolock

  • Finish date: Jan 2030

  • Tier 1 Main Contractor

The construction of 146 apartment units and 2 community/culture units contained in 3 blocks ranging in height from 1 storey to 8 storeys.

Hotel Development

  • Value: €10m

  • Location: City Centre

  • Finish date: June 2026

  • Main Contractor

Internal and external alterations to a 3-storey protected structure to accommodate a new hotel development with original brickwork.

 
For more information on construction activity in Dublin. Contact us on 071 912 8266 or jobs@brightpath.ie